At Joosten Winkelstellingen, we continue to grow and improve. We keep up with the times and continuously look for ways to make our services and operations more efficient and sustainable. An important step in this development is the realization of our new warehouse, which has now been completed. With this modern, sustainable location, we are ready for the future.
A modern business hall for a sustainable future
Our previous industrial hall, built in 1997, no longer met today’s requirements. Therefore, we decided to completely replace the building with a new, future-oriented warehouse.

Designed for maximum efficiency
In collaboration with MIBA Construction Management, we constructed a modern and sustainable building, with an efficient layout that makes optimal use of the space. The hall is fully insulated to the latest standards, so we have significantly reduced energy consumption.
In addition, the facility was designed with flexibility in mind, so that we can easily accommodate future developments and growth.
With this new location, we are taking a big step towards a more sustainable and efficient way of working. We are proud of this milestone and look forward to serving our customers even better from this modern environment!
